Industries
Supply defined by the conditions on site
The same four supply lines behave very differently in sour service, in an abrasive slurry circuit, on immersed steel or in hygienic production. Start where your assets are.
Oil & Gas
Coatings, piping, chemicals and equipment. One supply partner.
Upstream, midstream and downstream operations consume treatment chemistry continuously and install piping, coatings and equipment on project cycles. Arami supplies both sides through one commercial relationship.
Supply lines: Piping Materials & Fittings · Process Chemicals · Paints & Protective Coatings · Industrial Equipment
Mining & Mineral Processing
One partner across your reagent supply chain.
Grinding, flotation, concentrate handling, thickening, dewatering and circuit water each consume chemistry, and each depends on the equipment that doses and separates. Arami supplies both.
Supply lines: Process Chemicals · Industrial Equipment · Piping Materials & Fittings · Paints & Protective Coatings
Marine
Coating decisions made against the vessel, not a product list.
Hulls, ballast tanks, decks and topsides each have their own exposure and maintenance interval. Coating selection follows from the vessel's operating profile and the docking plan.
Supply lines: Paints & Protective Coatings · Industrial Equipment · Piping Materials & Fittings
Water Treatment
The treatment system—and the chemistry that keeps it running.
Process water, wastewater, effluent, recycling, reuse and produced water duties need the plant and the consumables planned together, not contracted separately.
Supply lines: Industrial Equipment · Process Chemicals · Piping Materials & Fittings · Paints & Protective Coatings
Personal Care & Manufacturing
Formulation ingredients and the equipment that fills them.
Formulation teams and production engineers usually buy ingredients and packaging machinery from unconnected suppliers. Arami covers both sides of that plan.
Supply lines: Process Chemicals · Industrial Equipment
Send us your specification. We’ll help define the supply.
Submit one product, a material list or a broader project requirement. If a specification is still open, say so — Arami will work through it with you and the manufacturer.





